Skip navigation

27 Testimonials Online

Can we Help?

If you have any questions, just let us know. Fill in your details below and we'll get back to you.

Contact Form

Mono - Cookery Room - Hertfordshire

Client Name:

Bedmond Primary School

Usage:

Cookery Room

Specification:

5m by 6m

Requirement

Bedmond Primary school wanted to create another classroom primarily for cookery lessons. The only available real estate was a courtyard within the school complex, which purportedly housed chickens at one time! Space and access was tight but we are used to building within confined areas and due to the nature of our builds, rarely requires large mechanical equipment. It’s noteworthy to say this fabulous multipurpose classroom came to fruition as a result of immense effort on the part of the school, including fund raising events. We worked closely with the school, revising the design a number of times to ensure it came in on budget and was acceptable to the Planning Officers. Despite these constraints it incorporates a number of bespoke features in addition to the high grade safety, security and energy efficiency features that define all our buildings.

Our Solution

  • Disability provision: This design incorporates a disabled toilet with specialist ramp access.
  • Functional design: A wide covered walkway linking this classroom with the main school building, clad to blend seamlessly with the rest of the building, provides shelter for children moving to and from the classroom or during break time. In summer is provides an additional outdoor teaching area.
  • Maximum Light: Floor to ceiling glazing on dual aspects of the room maximises natural light and gives an airy spacious feel to the room.
  • Affordable design: The contemporary anthracite grey frames are high quality uPVC, with our A-rated energy performance toughened glazing. Finger protectors fitted to French doors and windows to prevent accidents.
  • Additional Utilities: Our technicians ensured the additional services required for the kitchen (retrospectively fitted) were positioned and connection ready throughout the classroom.